Sucker River Mithwayawikamik Wellbeing Center
Notice of Intent to Make a Determination
Sucker River Mithwayawikamik Wellbeing Center - Public Comments invited
April 23, 2026 - Indigenous Services Canada must determine whether the proposed Sucker River Mithwayawikamik Wellbeing Center, to be located on Sucker River 156C, is likely to cause significant adverse environmental effects.
To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.
Written comments must be submitted by May 25, 2026 to:
Indigenous Services Canada
2010 12th Avenue
Regina, SK S4P 0M3
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Proposed Project
Lac La Ronge Indian Band is proposing to construct the Sucker River Mithwayawikamik Wellbeing Centre which will offer a community-based gathering center to improve the quality of existing programs and create new programs. The Sucker River Well‑Being Centre will be a new two‑story community facility intended to support health, wellness, cultural programming, and administrative functions for the Sucker River community.
The project involves the construction of a multi‑use building, the main floor spanning 1265 sqm including a fitness area, large multipurpose space, youth centre and gathering rooms, cultural space, kitchen, and washrooms. An upper floor, spanning 413 sqm will accommodate administrative offices for 8-12 staff, soft rooms, and a resource area. The facility is intended as a long‑term community asset, designed to accommodate up to 300 people, community gatherings, wellness activities, and daily operations, with a reserved provision for future expansion should additional funding become available. The project will require connection to existing infrastructure, including power, water and communication services and the installation of new supporting infrastructure, including an on‑site generator and propane tanks, to ensure operational continuity.
Additional infrastructure is also considered for the project, including a closed garage for few vehicles. A separate meat preparation building is also proposed as part of the development.
Document reference number: 1