Marten Falls Community Access Road Project

Registry Search Mobile

Registry Search

Skip to Filters

415 results

Document Consultation Progress Reports

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 248
  • Document Date: 2026-03-06
  • Document: 165662E.html
  • Relevance: 395.53
  • Consultation Progress Reports Part 1 Progress Report 1 - Appendix A: Distributions to All Indigenous Communities (PDF – 144 MB) Progress Report 2 - Introduction (PDF – 747 KB) Progress Report 2 - Appendix A: Distributions to All Indigenous Communities (PDF – 99 MB) Progress Report 3 - Introduction (PDF – 695 KB) Progress Report 3 - Appendix A: Distributions to All Indigenous Communities (PDF – 111 MB) Progress Report 4 - Introduction (PDF – 1.3 MB) Progress Report 4 - Appendix A: ...
1 alternate format found
French HTML
  • Relevance: 344.53
  • Rapports sur l'avancement des consultations (anglais seulement) Partie 1 Progress Report 1 - Appendix A: Distributions to All Indigenous Communities (PDF – 144 Mo) Progress Report 2 - Introduction (PDF – 747 Ko) Progress Report 2 - Appendix A: Distributions to All Indigenous Communities (PDF – 99 Mo) Progress Report 3 - Introduction (PDF – 695 Ko) Progress Report 3 - Appendix A: Distributions to All Indigenous Communities (PDF – 111 Mo) Progress Report 4 - Introduction (PDF – ...

Document Summary of the Impact Statement

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 247
  • Document Date: 2026-02-20
  • Document: 165197E.html
  • Relevance: 394.02
  • Summary of the Impact Statement Executive Summary (PDF – 2.1 MB) Message from the Chief (PDF – 260 KB) Aboriginal Treaty Rights and Interests (PDF – 3.4 MB) Archaeology and Cultural Heritage (PDF – 2.5 MB) Climate Change Adaptation (PDF – 1.1 MB) Community Well Being (PDF – 1.7 MB) Fish and Fish Habitat (PDF – 3.9 MB) Groundwater and Surface Water (PDF – 1.8 MB) Land and Resource Use and Visual Environment (PDF – 3.7 MB) Noise and Vibration (PDF – 3.6 MB) Peatland (PDF – ...
1 alternate format found
French HTML
  • Relevance: 343.02
  • Résumé de l'étude d'impact Resumé (PDF – 2.0 MB) Message du Chef (PDF – 328 KB) Droits et intérêts ancestraux et/ou issus de traités (PDF – 3.8 MB) Archéologie et patrimoire culturel (PDF – 2.5 MB) Adaptation aux changements climatiques (PDF – 1.1 MB) Bien-être communautaire (PDF – 1.7 MB) Poissons et habitat des poissons (PDF – 3.9 MB) Eaux souterraines et eaux de surface (PDF – 1.8 MB) Environnement visuel et utilisation du territoire et des ressources (PDF – 3.1 MB) Acoustique ...

Document Impact Statement

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 246
  • Document Date: 2026-02-20
  • Document: 165236E.html
  • Relevance: 394.02
  • Impact Statement Impact Statement (PDF – 199 MB) Appendices Appendix A Metrics Tables (PDF – 1.5 MB) Appendix AA Summary and Recommendations Tables (PDF – 2.4 MB) Appendix AB Preliminary Biodiversity Offset Plan.pdf (PDF – 5.2 MB) Appendix B Route Selection Method.pdf (PDF – 9.5 MB) Appendix C Concordance Tables (PDF – 1.2 MB) Appendix D Qualifications of Individuals (PDF – 660 KB) Appendix E Project Inclusions List (PDF – 560 KB) Appendix F Surface Water.pdf (PDF – ...
1 alternate format found
French HTML
  • Relevance: 343.02
  • Étude d'impact (anglais seulement) Impact Statement (PDF – 199 MB) Annexes Appendix A Metrics Tables (PDF – 1.5 MB) Appendix AA Summary and Recommendations Tables (PDF – 2.4 MB) Appendix AB Preliminary Biodiversity Offset Plan.pdf (PDF – 5.2 MB) Appendix B Route Selection Method.pdf (PDF – 9.5 MB) Appendix C Concordance Tables (PDF – 1.2 MB) Appendix D Qualifications of Individuals (PDF – 660 KB) Appendix E Project Inclusions List (PDF – 560 KB) Appendix F Surface Water.pdf (PDF ...

Document From the Impact Assessment Agency of Canada to Ontario Ministry of the Environment, Conservation and Parks re: Federal Provincial Co-operation on the Ongoing Ring of Fire Project Assessments under the Impact Assessment Act

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 245
  • Document Date: 2025-11-24
  • Document: 163942E.pdf
  • Relevance: 384.67
  • President Président 160 Elgin St., 22nd floor 160, rue Elgin, 22e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 Sarah Harrison Deputy Minister Ontario Ministry of the Environment, Conservation and Parks College Park, 5th Floor, 777 Bay Street Toronto ON M7A 2J3 Sarah.Harrison@ontario.ca Sarah Harrison: Subject: Federal Provincial Co-operation on the Ongoing Ring of Fire Project ...
1 alternate format found
French PDF
  • Relevance: 333.67
  • Président                               President 160, rue Elgin, 22e étage      160 Elgin St., 22nd floor Ottawa ON  K1A 0H3           Ottawa ON  K1A 0H3 Le 2424 novembre 2025 Envoyé par courriel Sarah Harrison Sous-ministre Ministère de l’Environnement, de la Protection de la nature et des Parcs  de l’Ontario College Park, 5e étage, 777 rue Bay Toronto ONON M7A 2J3 Sarah.Harrison@ontario.ca Madame Sarah Harrison ...

Document Notice of Transition to the Amended Impact Assessment Act

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 231
  • Document Date: 2024-10-08
  • Document: 159297E.html
  • Relevance: 343.95
  • Notice of Transition to the Amended Impact Assessment Act Ottawa — October 8, 2024 — On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that, in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take a step ...
1 alternate format found
French HTML
  • Relevance: 292.95
  • Avis de transition à la Loi sur l'évaluation d'impact modifiée Ottawa — 8 octobre 2024 — Le 20 juin 2024, la Loi no 1 d'exécution du budget de 2024 a reçu la sanction royale entraînant ainsi l'entrée en vigueur des modifications apportées à la Loi sur l'évaluation d'impact (la LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que, pour qu'un projet soit désigné en vertu de la LEI, le ministre de l'Environnement et du Changement climatique ou l'Agence ...

Document Notice of Time Limit Extension

  • Project Marten Falls Community Access Road Project
  • Document Category: Additional Information
  • Reference Number: 230
  • Document Date: 2024-10-08
  • Document: 159296E.html
  • Relevance: 343.95
  • October 8, 2024 — The Impact Assessment Agency of Canada is re-posting this Notice of Time Limit Extension with Reasons in accordance with the Notice of Transition. Notice of Time Limit Extension Ottawa — October 8, 2024 — On January 13, 2023, the Impact Assessment Agency of Canada (IAAC) granted an extension to the three-year time limit for Marten Falls First Nation (the proponent) to provide the required information or studies set out in the Notice of Commencement of the impact ...
1 alternate format found
French HTML
  • Relevance: 292.95
  • 8 octobre 2024 — L'AEIC d'évaluation d'impact réaffiche cet avis de prolongation de délai avec motifs conformément à l'avis de transition. Avis de prolongation de délai Ottawa — 8 octobre 2024 — Le 13 janvier 2023, l'Agence d'évaluation d'impact du Canada (l'AEIC) a accordé une prolongation du délai de trois ans dont disposait la Première Nation de Marten Falls (le promoteur) pour fournir les études ou renseignements mentionnés dans l'avis de lancement de l'évaluation d'impact du projet ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Date modified: