Wunnumin H1RCI Compound Construction

The project consists of constructing the necessary infrastructure in Wunnumin Lake First Nation to serve as a base of operations for Hydro One Remotes Communities Inc. ("Remotes").  This project forms part of the bigger Watay Project (Wataynikaneyap Transmission Project) in which sixteen First Nations are connected to Ontario's Transmission Network.  The project scope includes fencing off an area of approximately 4,688 m2 next to the airport.  The area will then be compacted and graded to allow for drainage with a granular material.  The next stage will involve construction a general storage building of 4.9 m x 7.3 m, a lines storage building of 4.9 m x 8.5 m, and a staff house of 8 m x 18 m.

 The necessary infrastructure on the site includes a drinking water system consisting of a drilled well, pump, treatment and controls, a sewage holding tank, and site electrical works.  A buried electrical service will connect the electrical works to the existing community supply.  In addition, the compound will also contain a three-bedroom staff house (modular), a bucket truck storage garage, a lines storage building, a pole bunk storage, and a transformer storage platform.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.

 

Latest update

NOTICE OF INTENT TO MAKE A DETERMINATION

November 13, 2019 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting public comments https://iaac-aeic.gc.ca/050/evaluations/document/133056 until December 13, 2019 respecting the determination.

NOTICE OF INTENT TO MAKE A DETERMINATION

November 13, 2019 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting public comments https://iaac-aeic.gc.ca/050/evaluations/document/133056 until December 13, 2019 respecting the determination.

NOTICE OF INTENT TO MAKE A DETERMINATION

November 13, 2019 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting public comments https://iaac-aeic.gc.ca/050/evaluations/document/133056 until December 13, 2019 respecting the determination.

More

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - November 13, 2019

List all documents

Contacts

  • Indigenous Services Canada - Ontario
  • 100 Anemki Place, Suite 101
  • Fort William First Nation, ON, P7J 1A5
  • Telephone: 807-624-5914
  • Email: julieta.werner@canada.ca

  • Location

    • Wunnumin Lake (Ontario)
  • Project Type

    • Building and Property Development
  • Status

    In progress
  • Start Date

    2019-11-13
  • Proponent

    Wunnumin Lake First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80308