Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

1041 results

Project Diversifying service offerings and increasing the capacity of the DG Canest Transit inc. terminal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88504
  • Last Modified: 2024-05-20
  • Relevance: 799.9
  • The proposed project is part of the National Trade Corridors Fund (NTCF) financing agreement reached between Montreal Port Authority and Transport Canada. The objectives of the project are to diversify the service offerings and increase the capacity of the DG Canest Transit inc. terminal. The project will take place at the sections 43 and 44 of the Port of Montreal (3700 Notre-Dame Est Street) and will include the following works Adjusting and adding equipments inside the existing ...

Project St. Laurent Boulevard Pipeline Replacement Project

  • Location (Nicholson Building RCMP HQ, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88502
  • Last Modified: 2024-05-19
  • Relevance: 799.79
  • Enbridge Gas Inc. (Enbridge Gas) is proposing to replace its St. Laurent Pipeline System that is currently located along St. Laurent Boulevard in Ottawa, Ontario (the Project). The Project is located east of the Rideau River and south of the Ottawa River, generally in the neighbourhoods of Rockcliffe and Manor parks, Vanier, Overbrook, Forbes, Cummings, Cyrville, and Ottawa South. The Project will involve the installation of approximately 13 km of new 6-inch, 12-inch, and 16-inch diameter ...

Project Installation of New Generator - 101 Colonel By Drive

  • Location (101 Colonel By Drive, Ottawa, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88493
  • Last Modified: 2024-05-18
  • Relevance: 799.68
  • The objective of this project is to demolish the old generators in room BS-076 and remove the current temporary generator and install a new permanent 1000Kw, 1,250 kVA, 347/600V standby generator in its place. The Generator will be one self-contained unit that includes a 2,500 L sub base fuel storage tank and a skin tight sound attenuated enclosure. The location of the new generator will be the same as the current temporary generator, outside of the building on the west side of the ...

Project Beardy's & Okemasis Cree Nation Stage 4 Subdivision

  • Location (Beardy's & Okemasis Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88564
  • Last Modified: 2024-05-17
  • Relevance: 799.65
  • The Beardy's & Okemasis Cree Nation Stage 4 Subdivision is proposing to construct 132 new residential lots to support future growth and housing on-reserve for the next 10 years. The Stage 4 Subdivision location was selected north and east of the Stage 3 Subdivision and will occupy approximately 82 hectares of land currently used for recreational and agricultural purposes. The project will include earthworks for lot grading and drainage and infrastructure for water, wastewater, roadway, ...

Project East promenade renewal - Canada Place

  • Location (East promenade renewal - Canada Place, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88562
  • Last Modified: 2024-05-17
  • Relevance: 799.65
  • Vancouver Fraser Port Authority (VFPA, the Applicant) is responsible for the rehabilitation and upgrading of the Canada Place east promenade located at 999 Canada Place (the Project) in Vancouver. The work generally includes rehabilitation and upgrade of the east promenade deck topping and waterproofing membrane. The promenade serves as the roof of interior space below. The following items have been identified as requiring rehabilitation / upgrade: Remove and replace the promenade ...

Project Design and Construct Armored Combat Support Vehicle (ACSV) Facility- 3rd Canadian Division Support Group, Edmonton

  • Location (3rd Canadian Division Support Group, Edmonton, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88563
  • Last Modified: 2024-05-17
  • Relevance: 799.64
  • The Department of National Defence (DND) is proposing the Defence Capability Infrastructure (DCI) project that will provide the infrastructure required to support the accommodation, operation and maintenance support for the 360 new Armoured Combat Support Vehicles (ACSV) at 3rd Canadian Division Support Group (3 CDSG) Edmonton, Alberta. To facilitate the new ACSV, infrastructure to accommodate approximately 9 bays with an estimated total gross floor area of 4,400 m² is required. The ...

Project NAV CANADA - Radiocommunications Tower (PRJ02758-Outside Plant FY24) - Ascot Corner (QC)

  • Location (PRJ02758-Outside Plant FY24 - Ascot Corner, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88561
  • Last Modified: 2024-05-17
  • Relevance: 799.64
  • NAV CANADA – Radiocommunications Tower (PRJ02758-Outside Plant FY24) – Ascot Corner (QC) NAV CANADA is proposing to erect a new 21.1 metre self-support tower located on chemin Deblois in Ascot Corner, to the northeast of Sherbrooke in Quebec. The purpose of this tower is to replace a 16.9 metre self-support tower that has reached end of life. This project will install a new 11 x 20 feet equipment shelter, erect a new antenna support tower, install equipment and RF cables. The ...

Project James Smith Cree Nation Peonan Creek Crossing

  • Location (James Smith Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88501
  • Last Modified: 2024-05-17
  • Relevance: 799.62
  • James Smith Cree Nation is proposing to install a new single span bridge over Peonan Creek northwest of the community core to connect housing and services on the west side of the creek to the community and to provide access to the new Wellness Centre and existing Sakwatamo Lodge. The bridge will be constructed at the former location of a large-diameter culvert crossing which washed out in 2007. Construction activities include site preparation by topsoil stripping and stockpiling, grading to ...

Project Trans Mountain Pipeline Site KP387 Bioremediation

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88500
  • Last Modified: 2024-05-17
  • Relevance: 799.57
  • During a reactivation dig in 2021, historical petroleum hydrocarbon contamination was discovered at a site on the Trans Mountain pipeline right of way (RoW) located 8 km west of Jasper and next to the Miette River. Further assessment delineated contamination along the right of way and adjacent wetland, fen and marsh. The Remedial Action Plan recommends in-situ bioremediation as the best option to reduce contaminants to acceptable levels in both soil and groundwater, while minimizing further ...

Project Rehabilitation of the Ottawa River Pathway East

  • Location (Rehabilitation of the Ottawa River Pathway East, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88499
  • Last Modified: 2024-05-17
  • Relevance: 799.57
  • The Capital Pathway is a key asset of the National Capital Commission (NCC) and connects more than 200 km of multi-use pathways. It extends from Gatineau Park, through Ottawa and into the Greenbelt. The pathway network connects the capital's parks, gardens, museums, and main attractions along the way for walking, running, cycling, in-line skating including several winter activities. The NCC has completed condition assessments along the Capital Pathway to identify areas requiring ...

Project Northlands Enabling Works

  • Location (Vancouver International Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88486
  • Last Modified: 2024-05-16
  • Relevance: 799.53
  • The Vancouver Airport Authority is preparing for future development of the Northlands properties located at the Vancouver International Airport in Richmond, B.C. The project will involve relocating approximately 2.5km of the primary security fence on the north side of the airfield.  In addition to relocating security fence the project will include construction of a new 2.5 km gravel access road within the airfield parallel to the new fence alignment, excavation of a new drainage ditch and ...

Project YMX International Aerocity of Mirabel - Soil rehabilitation on the site occupied by Mechachrome Canada Inc.

  • Location (YMX International Aerocity of Mirabel, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88560
  • Last Modified: 2024-05-16
  • Relevance: 799.53
  • The project consists of rehabilitating the soil of a portion of a retention basin located at 11,100 Julien-Audette Street at YMX International Aerocity of Mirabel on lots 5,257,239 and 5,257,236 of the Cadastre du Québec. The site is occupied by Mechachrome Canada Inc. The soils to be rehabilitated correspond to criteria "C" and above of the MELCCFP's Intervention Guide – Soil Protection and Rehabilitation of Contaminated Land and/or the CCME's industrial ...

Project Dry fire Hydrant in range and training areas - Valcartier Military Base Range and Training Area

  • Location (Valcartier Military Base Range and Training Area, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88558
  • Last Modified: 2024-05-16
  • Relevance: 799.52
  • The Department of National Defence (DND) has proposed a project. The goal of the project is to install a dry fire hydrant on the bridge crossing the Petite Rivière aux Pins. The dry fire hydrant will allow firetrucks to fill their tanks during emergencies.

Project ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425

  • Location (Kinonjeoshtegon First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88557
  • Last Modified: 2024-05-16
  • Relevance: 799.52
  • 1639m2 single storey, steel stud, metal-clad building with new gravel access and ten gravel parking stalls with electrical outlets. Two drainage swales on the south and north sides of the site, connecting to the exisiting drainage sitch east of the site. Approximately 30m to 50mm diameter potable water main, connecting to the existing municipal water infrastructure west of the site. Approximately 50m to 200mm diameter wastewater sewer, connecting to the existing municipal wastewater ...

Project Whitby Harbour Sediment Remediation, Whitby, Ontario

  • Location (Whitby Harbour, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87408
  • Last Modified: 2024-05-16
  • Relevance: 799.46
  • Fisheries and Oceans Canada (DFO)  proposes to undertake a sediment remediation project to address historic dioxin and furan contamination in Whitby Harbour, which is located on the northern shore of Lake Ontario, in the Town of Whitby, Ontario. The Whitby Harbour Sediment remediation Project includes the following activities: Establish a temporary storage area (TSA) equipped with a drainage culvert for dredge material. Construction of a transfer dock to facilitate the movement ...

Project Kinonjeoshtegon - CHRT 41 - CFS CENTER AND ASSOCIATED BUIDLINGS - P048401 - 2425

  • Location (Kitechuhmaykoosib Inninuwug First Nation, Ontario) (Kitechuhmaykoosib Inninuwug First Nation - Main site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88491
  • Last Modified: 2024-05-16
  • Relevance: 799.46
  • The proposed project is located in Kitechuhmaykoosib Inninuwug First Nation (KIFN), Ontario approximately 580 km north of Thunder Bay, Ontario. The Project includes two sites (Attachment 1: Figure 1) •Site #1 (the main site) is located at approximate UTM coordinates 16 U 307408 m E 5969562 m N within the main community on land parcel Part 1 Location CL 1715 of Kitchenuhmaykoosib Aaki No. 84 on Canada Land Survey Record 59544 and will be accessible by road year-round •Site #2 (the ...

Project ToB 24DP05 Banff Centre Renovations

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88492
  • Last Modified: 2024-05-16
  • Relevance: 799.46
  • The proponent is proposing interior and exterior renovations to two buildings at the Banff Centre for Arts and Creativity. The two buildings, Vinci and Farrally Hall, are at 100 and 104 St Julien Road. Both buildings will undergo various upgrades, such as new windows and doors, mechanical equipment, and walkways. The upgrades aim to improve the buildings' mechanical and electrical systems, life safety, accessibility, and interior finishes.

Project ToB 23DP65 7 Fairholme Place Deck Repair

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88494
  • Last Modified: 2024-05-16
  • Relevance: 799.46
  • The proponent is proposing to repair the existing deck at 7 Fairholme Place. Work will involve partially demolishing the existing deck and piles and installing the new deck and piles. The new deck will require four new piles and be approximately 9m2 larger than the existing one. No changes to utilities are anticipated. The project will take approximately four weeks to complete.

Project Sweetgrass First Nation Wastewater System Upgrades

  • Location (Sweetgrass First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88556
  • Last Modified: 2024-05-15
  • Relevance: 799.43
  • Sweetgrass First Nation is proposing a wastewater system upgrade project that entails capacity upgrades to the existing lagoon, construction of a new sewage pumping station, and installation of connecting underground sewage force main and sanitary mains. Upgrades completed through this project will provide the community with adequate wastewater infrastructure capacity to support the community's current and future needs. The lagoon expansion site is located immediately east of the ...

Project FortisBC Eagle Mountain Barge Landing Improvements - Indian Arm

  • Location (FortisBC Eagle Mountain Barge Landing Improvements - Indian Arm, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87251
  • Last Modified: 2024-05-15
  • Relevance: 799.42
  • FortisBC Energy Inc. proposes to carry out improvements to an existing barge landing site at the head of Indian Arm of Burrard Inlet. The improvements are required so the site can be used to support project activities related to the proposed Eagle Mountain Woodfibre Gas Pipeline Project. The barge landing would be used for the delivery of materials, equipment, and personnel to the eastern portion of the pipeline route. The improvements would include expansion of a truck turn around area and ...

Project Removal of the Ville de Vanier wreckage from the Lac Leamy outlet in Gatineau, Quebec

  • Location (Lac Leamy landfill, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88552
  • Last Modified: 2024-05-15
  • Relevance: 799.42
  • The Canadian Coast Guard (CCG) wishes to remove the wreck of the schooner Ville de Vanier which is in the waters of the outlet arm of Lac Leamy, in Gatineau. This wreck was considered a vessel of potential concern in 2019, and was the subject of a technical assessment in 2020 which led to the decision to proceed with its removal from the waters. Indeed, it presents dangers for the safety, health, well-being of the public and the environment, and an advanced state of ...

Project Lower Similkameen Indian Band - Deflection Berms Project

  • Location (Lower Similkameen Indian Band - Deflection Berms Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88553
  • Last Modified: 2024-05-14
  • Relevance: 799.33
  • The Lower Similkameen Indian Band Band is proposing to build two deflection berms on the Similkameen Indian Reserve No. 2.   The project scope is to build two earthen berms (630m and 260m long) upslope of existing and planned development to deflect flood waters away from structures downslope. The proponent has applied for funding from Indigenous Services Canada's Community Infrastructure Program the construction of the proposed berms. The proponent has applied to Environment ...

Project Birch Narrows Dene Nation Community Centre

  • Location (Birch Narrows Dene Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88554
  • Last Modified: 2024-05-14
  • Relevance: 799.32
  • The project involves the construction of a new community center within the Birch Narrows Dene Nation, adjacent to the community arena and store. The community center will be a 3,070.8 square meter facility, with support buildings including three (3) mental health suites and a sweat lodge/land-based learning facility with an expected lifespan of 25+ years. The scope of work includes site preparation (clearing of trees and grading of the site to support adequate drainage), construction of ...

Project Big River First Nation Reserve Drainage Re-Establishment

  • Location (Big River First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88496
  • Last Modified: 2024-05-14
  • Relevance: 799.32
  • Big River First Nation is proposing a new clear span bridge over the Big River to replace the three existing 2.3 meter diameter culverts. The project will consist of removing existing culverts, excavating for a new channel bed to match existing upstream and downstream channel bed, installing 3:1 sloped embankments at the bridge armored with rip rap in and near the water to prevent erosion during high flows. Construction of the new bridge abutments and wing walls will occur at the top of the ...

Project Reconfiguration of the Southwest Sector

  • Location (Saguenay Port, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87173
  • Last Modified: 2024-05-14
  • Relevance: 799.29
  • The project involves the development of a new paved outdoor storage area of 5200m2 total in the southwest sector of the Terminal from an existing area that had an area of 3000m2. The area will have to be excavated by blasting in order to increase the available area to 5200m2.  In addition to this work, lighting upgrades and the construction of a new drainage network in the area will be completed. The outdoor storage area will be specifically used for general cargo.

Project Morden Pesticide and Chemical Building Project

  • Location (Morden, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88479
  • Last Modified: 2024-05-14
  • Relevance: 799.25
  • Project Description: Agriculture and Agri-Food Canada (AAFC) intends to build two storage buildings to store laboratory chemicals (50 m2) and farm pesticides (201 m2) at the AAFC Morden Research and Development Center near Morden, Manitoba. The project also includes: 1. demolition of an existing old pesticide storage building (25 m2), 2. trenching for water, sewer, and electrical services from existing services, 3. constructing a 635 m2 parking lot and driveway, and 4. fencing a 2900 m2 area ...

Project Cheticamp River Restoration (2024): Long Pool & Robert's Brook Tributary

  • Location (Cape Breton Highlands National Park of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88551
  • Last Modified: 2024-05-13
  • Relevance: 799.21
  • This proposal seeks to remediate habitat degradation directly linked to human development at two locations on the Cheticamp River. At Long Pond, an important pool for Atlantic salmon, active erosion is threatening a 60m section that borders the Salmon Pool's Trail. Here, the overall objective aims to protect this important pool, while stabilizing the trail and maintaining visitor access to the upper river. Armor stone will be placed on the north embankment to protect against erosion. ...

Project Pheasant Rump Lagoon Expansion

  • Location (Pheasant Rump Nakota IR 68D, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88550
  • Last Modified: 2024-05-13
  • Relevance: 799.2
  • Pheasant Rump Nakota Nation is proposing a lagoon expansion project. These upgrades will provide adequate wastewater infrastructure capacity requirements to support the community's current and future needs. The lagoon expansion project will consist of a primary cell (0.28 ha treatment area) and an evaporation cell (17,176 sq.m. of evaporation area at full operating level). The existing access road will also be widened in one location to provide adequate space for a truck turn around area. ...

Project Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion

  • Location (Lac La Ronge Indian Band, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88549
  • Last Modified: 2024-05-13
  • Relevance: 799.2
  • The Lac La Ronge Indian Band is proposing a lagoon expansion project within the Lac La Ronge 156 Reserve. The existing two-cell facultative / exfiltration lagoon, located on provincial Crown land, provide wastewater treatment for the LLRIB reserves 156 and 156B and surrounding rural areas that utilize septic hauling. The lagoon is directly connected to the gravity sewer systems, pumping stations and force mains to provide wastewater service for Air Ronge and the LLRIB reserves 156 and 156B. The ...

Project Queensborough dike shoreline protection rehabilitation

  • Location (Queensborough dike shoreline protection rehabilitation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88484
  • Last Modified: 2024-05-13
  • Relevance: 799.14
  • The City of New Westminster is proposing to rehabilitate and stabilize a failing segment of existing rip-rap shoreline protection, approximately 130 metres in length, along the Queensborough Dike. The Project would consist of: Site preparation, including removal of vegetation, anthropogenic debris, existing rip rap and profile and grading the slope   Placement of geotextile, filter rock, rip rap and fill, if required Vegetation planting on the rip rap bench and ...

Project McArthurGlen Designer Outlet Expansion Phase 3

  • Location (Vancouver International Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88548
  • Last Modified: 2024-05-10
  • Relevance: 798.89
  • Templeton DOC Limited Partnership is proposing to expand the McArthurGlen Designer Outlet Vancouver Airport located at the Vancouver International Airport in Richmond, B.C. The expansion consists of approximately 6,130 square meters of new commercial retail buildings. Construction activities for the Phase 3 project will include some excavation of existing gravel base material, construction of new foundations, utilities and building structures. The operation of the expanded facility will be ...

Project Grassy Narrows Long-term Care and Treatment Facility Construction

  • Location (Grassy Narrows Long-term Care and Treatment Facility Construction, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88547
  • Last Modified: 2024-05-10
  • Relevance: 798.87
  • Asubpeeschoseewagong Netum Anishinabek (ANA) or Grassy Narrows First Nation (GNFN), is an Ojibway First Nation located in Northwestern Ontario, 80 km from Kenora and is accessible year-round via Highway 671, with a reserve land base of roughly 4,130 ha. As of February 2022, Grassy Narrows First Nation had a registered population of 1,599 with 968 living on reserve. The Asubpeeschoseewagong Anishinabek (ANA or Grassy Narrows) First Nation is an Ojibway First Nation with a reserve land base of ...

Project Mistawasis Nehiyawak Lagoon Upgrades

  • Location (Mistawasis Nêhiyawak, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88546
  • Last Modified: 2024-05-10
  • Relevance: 798.87
  • Mistawasis Nehiyawak is proposing an infrastructure upgrade project, relating to sanitary sewer treatment, collection and pumping. The project includes the construction of a new facultative lagoon, 1.2 km north east of the existing lagoon within 35-48-6 W3M.  Anew sewage force main will be required to be constructed from the existing sewage pumping station to the new lagoon location. The Project also includes a new gravity sewer in a common trench with the new forcemain to the lagoon to ...

Project Coldbrook Biodiversity Facility Water Control Structure Modifications, Coldbrook, Kings County, Nova Scotia

  • Location (The site is located on Grist Mill Pond on Spittal Brook, a tributary of the Cornwallis River, Annapolis Valley, Kings County, Nova Scotia., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88545
  • Last Modified: 2024-05-08
  • Relevance: 798.65
  • The proposed project involves the improvements to the concrete water control structure that supplies the Coldbrook Biodiversity Facility, a DFO – owned property in Coldbrook, Nova Scotia.   The project involves the improvements to the sluice gates, overflow spillway, and access walkway. The existing sluice gates will be disconnected for inspection; gate stem replaced; and manual actuators removed and replaced. The overflow spillway stop logs will be removed and replaced with ...

Project YUL Montréal-Trudeau International Airport - Development of a concrete storage area

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88543
  • Last Modified: 2024-05-08
  • Relevance: 798.65
  • The project consists of developing a storage area with reclaimed concrete slabs of approximately 9,500 m2 in the restricted area, in the northeast sector of the airport. The work includes site preparation, slab installation and drainage reprofiling.

Project Keltic Road Rehabilitation Project

  • Location (Cape Breton Highlands National Park, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80988
  • Last Modified: 2024-05-08
  • Relevance: 798.64
  • The project proposes to rehabilitate Keltic Road in Cape Breton Highlands National Park. Proposed works include the inland realignment of the Keltic In Road away from the coastal zone to address safety concerns caused by coastal erosion, and upgrades to aging infrastructure, including water and electrical systems. The existing portion of the Keltic In Road will be restored to a natural state in the future. Improvements to the existing conditions of the Keltic Out Road, such as repaving and ...

Project Renovation of hangar 6 at Mgr-Blanche terminal of the Port of Sept-Iles, to create a cruise passenger reception pavilion

  • Location (Port of Sept-Îles, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88544
  • Last Modified: 2024-05-08
  • Relevance: 798.64
  • The development of a permanent pavilion for welcoming cruise ship passengers in Sept-Îles has long been planned as part of the international cruise stop's development. Currently, a canvas tent at the Mgr-Blanche terminal serves as the reception pavilion, but with the arrival of winter cruises, a permanent solution is needed. Indeed, Sept-Îles is the only stop on the St. Lawrence without a permanent building for cruise passengers. The new pavilion must reflect the Innu identity, ...

Project Construction of a municipal garage in Wemotaci

  • Location (Wemotaci, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88475
  • Last Modified: 2024-05-08
  • Relevance: 798.59
  • The community garage will be built on a previously developed site,  south of the ecocenter and west of the aerated wastewater treatment ponds. The existing developed site (storage area) is approximately 80,000 m². No deforestation activities will be required to carry out the work, as the site is already cleared. The location of the future community garage is strategic, as it will facilitate the management of residual materials and wastewater from this infrastructure. The footprint ...

Project Pekisko Creek Bank Armouring by NOVA Gas Transmission Ltd.

  • Location (Bar U Ranch National Historic Site of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88473
  • Last Modified: 2024-05-08
  • Relevance: 798.59
  • NOVA Gas Transmission Ltd. (NGTL), a wholly owned subsidiary of TC Energy, is proposing to armour a section of Pekisko Creek passing through the Bar U Ranch National Historic site. The objective of the project is to mitigate potential integrity risk to an existing NGTL pipeline from ongoing bank erosion and encroachment of the stream into the pipeline right-of-way. Proposed erosion mitigation at the site includes the installation of 53 m of riprap, including a 27 m riprap revetment that will ...

Project Prince of Wales Hotel Fire Suppression System Intake Replacement in Emerald Bay, Upper Waterton Lake

  • Location (Waterton Lakes National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88474
  • Last Modified: 2024-05-08
  • Relevance: 798.59
  • The Prince of Wales Hotel, operated by Pursuit Collection in Waterton Lakes National Park, is proposing the replacement of its fire suppression system intake located in Emerald Bay, Upper Waterton Lake. The intake and/or piping into Emerald Bay are no longer functioning fully, believed to be due to rust and material breakdown, which could compromise fire suppression ability at the hotel. A temporary intake system will be installed to accommodate hotel operation between May to September 2024, ...

Project Saddle Island Interpretive Circuit

  • Location (Red Bay National Historic Site of Canada, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88541
  • Last Modified: 2024-05-07
  • Relevance: 798.52
  • The proposed project expands on the 2023 initiative aimed at revitalizing the visitor experience at Red Bay National Historic Site. Key components of this project include development of an interpretation circuit, construction of a replica Basque whaling station and memorial for Basque whalers, and enhancements to visitor facilities. The project scope encompasses the construction of four circular interpretation platforms interconnected by a pre-existing boardwalk, and installation of welcome ...

Project Maintenance of the minimal trail network at Pointe-de-l'Est National Wildlife Area

  • Location (Pointe-de-l'Est National Wildlife Area, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88540
  • Last Modified: 2024-05-06
  • Relevance: 798.43
  • ECCC and local partners will process to the maintenance of the Minimal Trails Network (MTN) at Pointe de l'Est National Wildlife Area. The work will mainly involve replacing damaged or missing signs and resurfacing certain sections of the trail and will be conducted in June 2024.

Project Tsuut'ina Chief Big Belly Solar Project

  • Location (Tsuut'ina Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87415
  • Last Modified: 2024-05-06
  • Relevance: 798.43
  • Tsuut'ina Nation plans to install a 150 kw solar array adjacent to the Chief Big Belly School. The proposed 50m by 50m solar array will be located on a hill west of the school and will augment power to the school. The project will require some vegetation clearing and leveling of the site prior to installation of the solar panels.  

Project Improvements to the Carbide Wilson Ruins and trail 36, Gatineau Park

  • Location (Gatineau Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88470
  • Last Modified: 2024-05-05
  • Relevance: 798.26
  • The National Capital Commission (NCC) plans to complete stabilization work at the Carbide Willson Ruins, as well as improvements to Trail 36. Trail 36 and the Carbide Willson Ruins are located in Chelsea, in Gatineau Park, approximately 1.5 km north of parking lot P11. The site is only accessible on foot via trail 36 in the park. Chelsea is part of the Collines-de-l'Outaouais municipalité régionale de comté (MRC), in the Outaouais administrative region.  Work ...

Project New Fibre Installation

  • Location (Project site 11 (Wabaseemoong Independent Nations), Ontario) (Project site 08 (Kenora No. 38B), Ontario) (Project site 15 (Gakijiwanong Anishinaabe Nation), Ontario) (Project site 18 (Wabauskang No. 21), Ontario) (Project site 24 (Shoal Lake No.39), Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88528
  • Last Modified: 2024-05-03
  • Relevance: 798.13
  • GCT#3 Representative Services plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in Shoal Lake No.40, Northwest Angle No.33, Lake of the Woods No. 37 (Animakee Wa Zhing #37), Northwest Bay (Naicatchewenin), Eagle Lake, Rainy River First Nations, Couchiching First Nation, Kenora No. 38B (Anishinabe of Wauzhushk Onigum), Grassy Narrows First Nation, Niisaachewan Anishinaabe Nation, Wabaseemoong Independent Nations, Lac Des Mille Lacs, ...

Project Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw

  • Location (15 Wing Moose Jaw, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88538
  • Last Modified: 2024-05-03
  • Relevance: 798.1
  • The Department of National Defence (DND) has proposed a project. The project objective is to replace the sanitary and storm sewer lines that have exceeded 50% or more of their serviceable life and replace the potable water distribution network across 15 Wing Moose Jaw in a series of six (6) phases. The scope of work includes: Pipe excavation, Pipe replacement, Pipe repair, Pipe lining, Manhole and catch basin replacement (complete or partial), Manhole and catch basin ...

Project Construction of Coastal and River Flood Protection Works to retain recurrent flooding in Tsulquate 4 on Gwa'sala-'Nakwaxda'xw Territory Project

  • Location (Construction of Coastal and River Flood Protection Works to retain recurrent flooding in Tsulquate 4 on Gwa?sala-?Nakwaxda?xw Territory Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84326
  • Last Modified: 2024-05-03
  • Relevance: 798.09
  • The proposed project consists of four main components to protect the Tsulquate 4 reserve on Gwa'sala-‘Nakwaxda'xw Territory from flooding: 1. A sea dike with a flat engineered beach along the foreshore slope connected to a river dike along the Lower Tsulquate River; 2. The area behind the new dikes would be raised to the flood construction levels; 3. Existing houses and services will need to be raised or replaced; 4. The bridge river crossing at the Lower Tsulquate ...

Project Construction of a Fire Access Road - Excalibur Pad- Garrison Petawawa

  • Location (Garrison Petawawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88537
  • Last Modified: 2024-05-03
  • Relevance: 798.08
  • The Department of National Defence (DND) has proposed a project. Real Properties Operations Detachment Petawawa at Garrison Petawawa is proposing the construction of a fire access road to allow Garrison fire vehicles to transit areas in order to manage wildfires within the Range and Training Area of the Garrison.

Project Construction of Wildland Fire Fighting Training Building - Garrison Petawawa

  • Location (Garrison Petawawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88536
  • Last Modified: 2024-05-03
  • Relevance: 798.08
  • The Department of National Defence (DND) has proposed a project. Real Properties Operations Detachment Petawawa at Garrison Petawawa is proposing the construction of a Wildland Fire Fighting Training Building to accommodate the associated personnel and equipment to fight wildland fires at Garrison Petawawa within the Range and Training Area of the Garrison.

Project High Country Inn Renovations and Landscaping - 419 Banff Avenue

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88466
  • Last Modified: 2024-05-03
  • Relevance: 798.04
  • Interior and exterior renovations and landscaping to existing hotel and restaurant. Exterior updates include replacing roof, replacing existing sunroom on front of restaurant, replacing existing gable and awning with new roof above the restaurant entry, and other updates to exterior finishes. Landscaping changes include extending existing restaurant patio and adding softscaped seating area, adding accessible ramp, removing 2 trees, decreasing driveway size, updating planters, and planting ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Assessment Type Display Filters

Authorities Display Filters

Date modified: