This project is to construct a new direct haul solid waste transfer station (SWTS) for Buffalo River Dene Nation (BRDN), south of the existing uncontrolled landfill in NE-33-79-19-W3M located approximately 4.5 km south of the main community of Dillon, Saskatchewan and east of Highway No. 924. The solid waste transfer station has an estimated 20-year lifespan design. Strategies to remediate and prepare for the existing landfill closure have also been evaluated in the scope of work.
New infrastructure includes an access road, full enclosure fence with gate, operator building with washroom and office, equipment storage building, grade separated WTS with roll-off (RO) bins for construction and demolition (C&D) waste and some residential waste, one RO bin for metals, small bin at entrance for after hours drop-off, and a shipping container for hazardous waste. Additional bins for recyclable material will be provided as required.
Proposed activities include:
• Planning for a waste transfer station approximately 1.6 ha in size and an access road from the existing landfill road.
• Clearing and grubbing of proposed site (partially completed in winter 2021).
• Tender Contract (Winter/Spring 2022, pending ISC approval)
• Construction of access road, drive lanes, bin storage pad, operator and equipment storage buildings (Spring/summer/fall 2022). Topsoil stripping to be repurposed for landscaping and regeneration purposes.
• Construction waste removal with operation to immediately follow (Fall/winter 2022).
Vegetation will be removed and used for firewood or composted at the nearby landfill.
Construction waste will be removed and hauled to a Regional Solid Waste Management Facility.
During operations, hazardous waste material will be stored in shipping containers until ready for transport to southern facilities for recycling or disposal.
Latest update
.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Buffalo River Dene Nation Solid Waste Transfer Station | - | February 27, 2024 |
| 1 | Public Comment Period on Intent to Make a Determination | - | October 26, 2021 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- BUFFALO RIVER DENE NATION RESERVE #193 (Saskatchewan)
-
Nature of Activity
- Waste Management
-
Assessment Status
Completed -
Start Date
2021-10-26 -
Proponent
Buffalo River Dene Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83121
Nearby assessments
...within 200 kilometres-
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Buffalo River Dene Nation Fire Hall
Peter Pond Lake Indian Reserve No. 193 -
Buffalo River Dene Nation Lagoon Expansion
BUFFALO RIVER DENE NATION RESERVE NO. 193 -
Buffalo River Dene Nation School Bypass Road Relocation
Buffalo River Dene Nation -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Birch Narrows First Nation Solid Waste Transfer Station
Turnor Lake Indian Reserve 193B -
Birch Narrows Dene Nation Community Centre
Birch Narrows Dene Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 2) -
La Loche Hotel
La Loche -
Blanket Permit - SaskPower - Wapachewunak First Nation (English River First Nation)
Wapachewunak First Nation No. 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 2) -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 1) -
Armand Bekkattla Treatment Centre Recapitalization and Expansion
Clearwater River Dene Band 222 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
1121393 - 0861 - SubD(13RUP) CPFN Janvier - Phase 2
Janvier -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
0861 - Upgrade (33 & 48 - 60mm) North Janvier
Janvier -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
La Plonge Solar Project
English River First Nation Reserve -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Main Transportation Pipeline -
Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta
Cenovus Foster Creek - North Trunk Gate (NTG) -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176 -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176A -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 7: West Central region - Thunderchild Fixed Wireless Tower -
Dore Lake Wharf Removal
Dore Lake -
Big Island Lake Cree Nation Child and Family Service Centre
Big Island Lake Cree Territory -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 2: West Central region - Big Island Lake -
Powwow Arbour Construction
Pierceland -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation English Bay Gas Station Project
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nations-Four Unit Housing Project 2024 2025
Cold Lake First Nations -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
Regional Assessment of Beaver Lake Cree Nation's Asserted Traditional Territory
Lac la Biche -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Snow and Ice Clearing (SNIC) Expansion – 4 Wing Cold Lake
4 Wing Cold Lake -
Medley Extension – 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
TERMINATED: Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Construction of a Retail Warehouse - 4 Wing Cold Lake
4 Wing Cold Lake -
Relocation of the Deployable Maintenance Facility (DMF) Training Compound – 4 Wing Cold Lake
4 Wing Cold Lake -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Development of Hangars in the Quick Reaction Area – 4 Wing Cold Lake, Alberta
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 – Cold Lake Air Weapons Range
Cold Lake Air Weapons Range -
The Design and Construction (Modified Design Build) of the New 4 Wing Quick Reaction Alert (QRA) Area– 4 Wing Cold Lake
4 Wing Cold Lake -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
Heart Lake First Nation - ATCO Gas Main Installation
Heart Lake First Nation -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
New Fibre Installation
Project Site 2 - Heart Lake: -
Heart Lake ATCO Gas Distribution Project
Heart Lake First Nation -
Heart Lake 3-Phase Powerline (Fortis# 500111166)
Heart Lake First Nation -
Heart Lake First Nation - Lift Station Replacement and Sanitary Sewer Line Install
Heart Lake First Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nations 3-Phase Subdivision Development
Cold Lake First Nations -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Heart Lake Water Treatment Plant and Intake Design
Heart Lake First Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Patterson Lake South Mine Project
Patterson Lake -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Ministikwan Community Road Repairs
Ministikwan Lake Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Rook I Project
Patterson Lake -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray