Pierre River Mine Project
The Pierre River Mine project proposed by Shell Canada includes the construction, operation, and reclamation of an oil sands surface mine and bitumen extraction facilities. The proposed mining project would be located approximately 90 km north of Fort McMurray on the west side of the Athabasca River. The proposed development includes an open-pit mine, ore handling facility, bitumen extraction facilities, tailings processing facilities, support infrastructure, water and tailings management plans, as well as the construction of a bridge across the Athabasca River. The project is designed to produce a total of 200,000 barrels of bitumen per day.
Latest update
Participate
Contacts
Impact Assessment Agency of Canada160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Fort McKay (Alberta)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
Terminated -
Start Date
2010-12-03 -
Proponent
Shell Canada Limited -
Authorities
- Canadian Environmental Assessment Agency
-
Assessment Type
Environmental assessment by Review Panel under CEAA 2012 -
Reference Number
59539
Nearby assessments
...within 200 kilometres-
Frontier Oil Sands Mine Project
Fort McKay -
Jackpine Mine Expansion Project
Fort McKay -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Carbon Capture Infrastructure and Lateral Pipelines -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray -
Big Egg Lake Water Control Structure
Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201) -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Big Bear Camp Aerodrome Project
Grygar Lake -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176A -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Allison Bay Subdivision Earthworks
ALLISON BAY NO. 219 -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
Patterson Lake South Mine Project
Patterson Lake -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176 -
Rook I Project
Patterson Lake -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Wood Buffalo National Park Moose Island Fire Guard Maintenance
Wood Buffalo National Park of Canada -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Armand Bekkattla Treatment Centre Recapitalization and Expansion
Clearwater River Dene Band 222 -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
La Loche Hotel
La Loche -
Little Red River Housing Project MLG# 28404408 (3 Units)
Little Red River Cree Nation -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Main Transportation Pipeline -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
0861 - Upgrade (33 & 48 - 60mm) North Janvier
Janvier -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
1121393 - 0861 - SubD(13RUP) CPFN Janvier - Phase 2
Janvier -
Little Red River Cree Nation: Fox Lake New School
Fox Lake -
New Fox Lake RCMP Detachment
Fox Lake