Water Control Infrastructure and Dike Repair and Maintenance Part II - St. Clair National Wildlife Area
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Ducks Unlimited Canada (DUC) is proposing to undertake maintenance and repair activities to improve the dike infrastructure within the St. Clair National Wildlife Area, located in Pain Court, Ontario. These dikes are crucial to controlling the water levels within the National Wildlife Area. They also help mitigate the risk of flooding and improve wildlife habitat. Proper functioning of this infrastructure is necessary to ensure the effective management of the area for wildlife, their habitats, federal infrastructure, and public visitor access.
DUC will reconstruct and realign several dikes at the Bear Creek Unit using heavy machinery and imported materials. The dike tops at Bear Creek Unit will be regraded to allow for ease of travel and a generator will be installed to supply the existing Snye Cell pump station with electricity. At the St. Clair Unit the existing log boom will be replaced with a new boom with hanging debris panels. Both sites will have trees selectively removed to help stabilize the dikes from future structural damage.
The proposed work will be completed during the fall to winter within the Department of Fisheries and Oceans species at risk timing windows. Prior to any work commencing the areas will be searched by qualified individuals to remove any wildlife. Exposed soil and excavated material will be re-graded, stabilized and/or re-seeded using appropriate native plants, soils, seed mix and seed application at the completion of construction. Sediment and erosion control will be used where necessary.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Water Control Infrastructure and Dike Repair and Maintenance Part II - St. Clair National Wildlife Area | - | May 15, 2024 |
Contacts
Environment and Climate Change Canada, Canadian Wildlife ServiceJohn Viengkone, Protected Areas Officer - Ontario
4905 Dufferin St.
Toronto, Ontario M3H 5T4
Telephone: 416-884-5148
Email: john.viengkone@ec.gc.ca
-
Location
- St. Clair National Wildlife Area (Ontario)
-
Nature of Activity
- Maintenance activities (fences, walls)
-
Assessment Status
In progress -
Start Date
2024-10-01 -
Proponent
Ducks Unlimited Canada -
Authorities
- Environment and Climate Change Canada
-
Assessment Type
Project on federal lands -
Reference Number
88520
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Water Control Infrastructure and Dike Repair and Maintenance Part I - St. Clair National Wildlife Area
St. Clair National Wildlife Area -
Full Restoration of Parking Garage Ramp and Repairs to Parking Structure
65 William Street, Chatham, Ontario -
Replacement of Tecumseh Road Culvert
Wallaceburg -
CBSA Walpole Island - New Building
Walpole Island -
Totten Farm Access Road
1367 County Road 46, South Woodslee -
Wheatley Harbour Maintenance Dredging - 2020-2021
Wheatley Harbour -
Wheatley Harbour Dredging Project - Winter 2020
Wheatley Harbour -
Wheatley Harbour Project
Wheatley Harbour -
Caldwell First Nation - Subdivision Development
Caldwell First Nation -
Natural infrastructure for Caldwell First Nation
Caldwell First Nation - Leamington -
Rondeau Jetty Refurbishment 2021
Erieau, ON -
Rondeau Jetty 5 Rehabilitation
Rondeau Harbour, Erieau -
Vegetation Maintenance at Point Pelee National Park
Point Pelee National Park -
Sewage Treatment System Replacements and Upgrades at Point Pelee National Park
Point Pelee National Park -
Decommissioning of the Power Corridor at Point Pelee National Park
Point Pelee National Park -
Deer Herd Reduction, Point Pelee National Park
Point Pelee National Park -
Point Pelee Marsh Restoration Project
Detailed Impact Assessment, Point Pelee National Park -
Hydrogen Ready Power Plant Project
Courtright -
Green Electron Natural Gas Power Generation Project
St. Clair Township -
Septic Tank Decommissioning
Point Pelee National Park of Canada -
Cedar Beach Minor Dredging
Cedar Beach, ON -
Ambassador Bridge Enhancement Project
Windsor -
HMCS Hunter Embankment Erosion Repair
HMCS Hunter, 90 Mill Street in Windsor -
J5D OPGW Upgrade Project
Windsor -
J5D OPGW Upgrade Project
Windsor -
Colchester Harbour Maintenance Dredging Project 2021
Colchester Harbour -
Vidal Street South Area Watermain Replacement
Sarnia -
Pelee Island Harbour Dock Replacement
Pelee Island Small Craft Harbour -
Alma Street Parkette Shoreline Protections
Town of Amherstburg -
Canadian Coast Guard Amhersburg Base Wharf Repair Project
Amherstburg -
Boblo Island Ferry Dock Demolition
Amherstburg -
Oneida Language Survivance
Southwold -
Installation of Temporary Housing at Stony Point (Former Camp Ipperwash), Ontario
Stony Point is located at 9356 Army Camp Road within the municipality of Lambton Shores -
Decommission Small Arms Range Target and Remediation of Contaminated Soils - Stony Point (Former Camp Ipperwash), Ontario
Stony Point (Former Camp Ipperwash) -
Infrastructure Removal and Soil Remediation - Stony Point (Former Camp Ipperwash), Ontario
Stony Point (Former Camp Ipperwash -
Building Demolitions and Associated Soil Remediation at Stony Point (former Camp Ipperwash), Ontario
Stony Point is located at 9356 Army Camp Road within the municipality of Lambton Shores, in southwestern Ontario -
Ammo Compound Demolition at Stony Point (former Camp Ipperwash), Ontario
9356 Army Camp Road within the municipality of Lambton Shores, in southwestern Ontario. -
Foundation Demolition and Associated Soil Remediation at Stony Point (former Camp Ipperwash), Ontario
Stony Point is located at 9356 Army Camp Road within the municipality of Lambton Shores. -
Courtyard Pavement Refurbishment and Sealing of the Underground Roof Garage
451 Talbot Street, London, Ontario -
Grand Bend Harbour Dredging - Spring 2021
Grand Bend Harbour -
Grand Bend Harbour Underground Storage Tank Removal
Grand Bend -
Port Burwell Maintenance Dredging
Lake Erie, Port Burwell, Ontario -
Port Burwell Marina Floating Docks
Port Burwell, ON -
Bayfield Harbour - North and South Pier Minor Works and Shore Protection
Bayfield Harbour -
Bayfield Annual Dredge Project
Bayfield -
Replacement of Big Creek Bridge on Long Point Causeway
Replacement of Big Creek Bridge on Long Point Causeway -
Water Control Infrastructure and Dike Repair and Maintenance Part II - Big Creek National Wildlife Area
Big Creek National Wildlife Area -
Water Control Infrastructure and Dike Repair and Maintenance - Big Creek National Wildlife Area
Big Creek National Wildlife Area -
Port Dover Search and Rescue Station Floating Dock Repairs
Port Dover -
Lighting and Pathway Upgrades
Woodside National Historic Site