Obashkaandagaang First Nation Water Treatment Project

The Obashkaandagaang First Nation requires a new water treatment plant (WTP) and storage reservoir to replace the non-operating water treatment system currently in the community. The project will include installing a water intake pipe into the Lake of the Woods approximately 75 m off of the shore, a backwash outfall pipe approximately 95 m from the shore, constructing a new WTP building with below ground concrete reservoir and installing water service piping throughout the west end of the community. The water treatment system will be sized for fire flows to design year 20, based on projected population growth. The infrastructure for this project includes: New WTP building with treatment and disinfection equipment, a below grade concrete water reservoir under the WTP building , a genset for backup power, a granular approach and parking area around WTP building, electricity and communication lines to the WTP building, a septic field for the WTP wastewater, a 75 m water intake pipe into Lake of the Woods, a 95 m backwash outfall pipe into Lake of the Woods, distribution pumps and 1,165 m of watermain piping.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.

 

Latest update

The assessment is in progress.

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - October 11, 2019

List all documents

Contacts

  • Michael King
  • Indigenous Services Canada
  • 100 Anemki Drive
  • Fort William First Nation, ON, P7J 1A5
  • Telephone: 807-624-5907
  • Email: michael.king@canada.ca