Atikameksheng Anishnawbek Septic & Watermain Upgrade
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The main objective of this project is to replace aging septic tanks. Mitigation strategies include; use of portable toilets and longer installations can be done over the weekend when the buildings are closed. A second component is to replace a cast iron water distribution line that has had previous issues of freezing. Mitigation strategy is to keep the old line in service until the new line is in service, health & safety is paramount during construction. The scope of the project is to replace 35 septic systems near the end of their life cycle. The septic systems will be class IV and will treat raw sewage. The septic systems are scattered throughout our community and include 2 band buildings, 1 row housing with 10 units and 32 housing units. The second component is to replace a 300 meter water distribution line and add a fire hydrant. This line services 14 households and 2 commercial buildings. This also includes repaving half the roadway. New septics will offer safer and cleaner water being returned to the land and water within our community and provide an additional quality of service to the occupants. It will provide time to work and build a strategy to ultimately connect to a sanitation treatment facility. It will provide cleaner drinking water and additional support for firefighters with a new hydrant. Training for youth & community members.
Latest update
2021-10-06 – The public comment period on the project is closed. Infrastructure Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects..
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Determination | - | January 7, 2025 |
Contacts
Jessica ManthaHousing Infrastructure and Communities Canada
Jessica Mantha, Environmental Assessment and Indigenous Consultation Analyst
180 Kent Street
Ottawa, Ontario K1P 0B6
Telephone: 365-383-2509
Email: Jessica.Mantha@infc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Naughton (Ontario)
-
Nature of Activity
- Waste Management
-
Assessment Status
Completed -
Start Date
2021-05-03 -
Proponent
Atikameksheng Anishnawbek -
Authorities
- Infrastructure Canada
-
Assessment Type
Project on federal lands -
Reference Number
82870
Nearby assessments
...within 200 kilometres-
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng By-Pass Road Construction - additional Federal Authority
Naughton -
Atikameksheng Anishnawbek First Nation Business Park
Atikameksheng Anishnawbek First Nation -
Victoria Mine Project
Southwest of Sudbury -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
New Fibre Installation
Project site 12: WHITEFISH LAKE INDIAN RESERVE NO. 6 -
New Fibre Installation
Project site 1: Ella Lake -
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
New Fibre Installation
Project site 04: WHITEFISH RIVER INDIAN RESERVE NO. 4 -
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Wahnapitae FN Micro Subdivision Project
Wahnapitae First Nation -
Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
Wahnapitae First Nation -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Wahnapitae First Nation Aggregate Project
location -
Wahnapitae First Nation
Wahnapitae First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Whitefish River First Nation - Waste Transfer Station Construction and Landfill Closure
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
WRFN Septic Bed Assessment/Replacement Program
WRFN Septic Bed Assessment/Replacement Program -
15 Lot Subdivision Expansion- Whitefish River First Nation
Whitefish River First Nation -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
New Fibre Installation
Project site 05: WIKWEMIKONG UNCEDED RESERVE -
Sagamok Anishnawbek - Family Hub Complex Construction
Sagamok Anishnawbek -
Wikwemikong First Nation - Lot Servicing
Wikwemikong Unceded Territory -
Wikwemikong First Nation - Elders Home Redevelopment
Wikwemikong First Nation -
Sagamok First Nation- Tree Clearing and School Construction Project
Sagamok New School -
New Fibre Installation
Project site 18: Sucker Creek Indian Reserve No.23 -
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
New Fibre Installation
Project site 17: Sheguandah Indian Reserve No.24 -
New Fibre Installation
Project site 11: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 06: WIKWEMIKONG UNCEDED RESERVE -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
New Fibre Installation
Project site 10: WIKWEMIKONG UNCEDED RESERVE -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Dokis First Nation Water Treatment Plant
Dokis First Nation -
Dokis First Nation - Chaudière Bridge Replacement Project
Dokis First Nation -
Portage Channel Bridge Replacement - Keso Bay Road
Dokis -
Roof Replacement - French River Dams Office
French River Dam -
French River Dams - Bearing Repairs
French River Dams -
Portage Dam Concrete Storage Pad
Portage Dam -
French River Septic Replacement
French River Dam Office -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Waste Transfer Station Construction
M'Chigeeng -
New Fibre Installation
Project site 20: M'chigeeng Indian Reserve No. 22 -
VLA Water Plant Replacement
Nipissing -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
Nipissing First Nation - 20 Unit Subdivision Project
Nipissing First Nation -
Nipissing First Nation - Cultural Center Construction
Nipissing First Nation -
Serpent River First Nation - Cutler Acid Remediation Project
Serpent River First Nation -
Temagami First Nation Outdoor Cultural Spaces
Bear Island -
New Fibre Installation
Project site 13: SERPENT RIVER INDIAN RESERVE NO. 7 -
New Fibre Installation
Project site 09: SERPENT RIVER INDIAN RESERVE NO. 7 -
Mnogin Constructed Wetland to Support Sustainable Water Treatment
Mnogin Constructed Wetland to Support Sustainable Water Treatment -
Short Range Development (SRD) Fence Installation – 22 Wing North Bay
22 Wing North Bay -
Short Range Development Road Upgrades and Bridge Replacement - 22 Wing North Bay
22 Wing North Bay -
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Shawanaga First Nation - Lot Servicing for future houses
Shawanaga First Nation -
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
New Fibre Installation
NIPISSING INDIAN RESERVE NO. 10 -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
New Fibre Installation - North Bay ON
Project site 1 - Lake Nipissing -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
North Bay – Pile replacement project
North Bay -
Kimball Cottage Decommission
Bruce Peninsula National Park of Canada -
Davis Cabin Relocation
Bruce Peninsula National Park of Canada -
North Bay Small Craft Harbour Rehabilitation
North Bay -
Tobermory (Little Tub) Harbour - North and West Wall Rehabilitation
Tobermory -
Gima Kwe Nong Parking Area
Bruce Peninsula National Park of Canada -
Energy East Project
North Bay -
Cyprus/Cameron Pedestrian Bridge Replacement
Bruce Peninsula National Park of Canada -
Gima Kwe Nong Dock Replacement
Bruce Peninsula National Park -
Chippewa Barracks Perimeter Security Fence, Fort Chippewa Barracks, 540 Chippewa St W, in North Bay Ontario
Fort Chippewa Barracks, 540 Chippewa St W, in North Bay -
New Fibre Installation
Project site 03: MISSISSAGI RIVER INDIAN RESERVE NO. 8 -
Shaw Farm Decommission
Bruce Peninsula National Park of Canada -
New Fibre Installation - North Bay ON
Project site 2 - Ruth Lake -
Upgrade Underground Municipal Services - 22 Wing North Bay
22 Wing North Bay -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Shared Services Canada Upgrades - 22 Wing North Bay
22 Wing North Bay -
Dyer's Bay Small Craft Harbour - Wharf Repair
Dyer's Bay -
Sheshegwaning Samson Edowishkosh Elementary School Construction
Sheshegwaning First Nation -
Improvements to Two Roads in Sheshagwaning First Nation
Improvements to Two Roads in Sheshagwaning First Nation -
New Fibre Installation
Project site 16: Sheshegwaning Indian Reserve No.20 -
Hidden Valley Road Box Culvert
Bruce Peninsula National Park -
Zhiibaahaasing Water Storage and Distribution System Upgrades
Zhiibaahaasing Indian Reserve. No. 19 -
New Fibre Installation
Project site 15: Zubaahaasing Indian Reserve No. 19A -
Zhiibaahaasing - 10 Unit Housing Project
Zhiibaahaasing -
Côté Gold Mine Project
Gogama -
Mississauga First nation - Gas Bar Tank Removal
Mississauga First Nation -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Latchford Dam - Public Safety Fencing
Latchford Dam -
Permanent Waterway Barriers for Latchford Dam
Latchford Dam -
New Stoplog Lifter Latchford Dam
Latchford Dam -
Bank Stabilization at Latchford Dam
Latchford Dam -
Wasauksing First Nation - 10 Unit Residential Construction Project
Wasauksing First Nation -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Wasauksing First Nation - Lot Servicing for future houses
Wasauksing First Nation -
New Fibre Installation
Project site 19: Sagamok Indian Reserve -
Lion's Head Harbour Dredging Project - Spring 2021
Lion's Head Harbour -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
New Fibre Installation
Project site 1: Spottswood Bay, Lake Talon -
Chippewas of Nawash Lot Servicing
Chippewas of Nawash First Nation -
Chippewas of Nawash Multi-use Building
Chippewas of Nawash First Nation -
Timiskaming Dams Complex - Buildings Replacement
Timiskaming Dams Complex in Long Sault Island, Temiscaming, ON -
Not Applicable
Timiskaming Dam -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Timiskaming Dam-Bridge of Quebec Replacement Project
Temiscaming -
New Fibre Installation
Project Site 2: Kaibuskong Bay -
Chippewas of Nawash Community Centre Renovations and Additions
Neyaashiinigmiing Reserve No. 27 -
Haileybury Bin Wall Repairs - Summer 2021
Haileybury -
New Fibre Installation
Project site 08: THESSALON INDIAN RESERVE NO. 12 -
Thessalon First Nation - Lot Servicing Project
Thessalon First Nation -
Marina Construction Project
Kebaowek -
Development of four new streets in Kebaowek
Development of four new streets in Kebaowek -
New Fibre Installation
Project site 02: THESSALON INDIAN RESERVE NO. 12 -
Wiarton Breakwater Replacement
Wiarton Launch Ramp -
Widjikiwe Gas Bar
Timiskaming -
Matachewan First Nation Landfill and Septic Holding Pit Closure
Matachewan -
Wahta Mohawk Housing Subdivision Project
Wahta Mohawk -
Matachewan New Housing Construction Project
Matachewan First Nation -
Wahta Mohawks - Waste Transfer Station and Landfill Closure
Wahta Mohawks -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation
Beausoleil First Nation Reserve -
4th Canadian Division Training Centre (Meaford) North Shore Road Erosion Control
4th Canadian Division Training Centre (Meaford) -
Paardeberg Range Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
DND Relocated Infrastructure Project at the 4th Canadian Division Training Center (4 CDTC) in Meaford, Ontario
4th Canadian Division Training Center -
Cassino Range Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
Guardrail Installations at select Culverts on Lower Spring Road and 11th Line at 4 CDTC Meaford
4 CDTC Meaford -
Melfa Range Drainage Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
Break Wall Repairs by private home owner - 318433 Grey Rd 1, Owen Sound Harbour, ON
Owen Sound Harbour -
Camp Queen Elizabeth Dining Hall and Wellness Cabin Improvement Project, Beausoleil Island
Georgian Bay Islands National Park of Canada -
YMCA Camp Queen Elizabeth Cabin Improvement Project
Georgian Bay Islands National Park -
Ontario Pumped Storage Hydropower Project
5 km north of Meaford -
Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes
Bala -
Replace Culverts on Lower Spring Road and 11th Line - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
Ammunition Compound Control Gate - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
Impeed the Reed
Georgian Bay Islands National Park -
Potable Water Well Installation; private residence well.
Public Port of Owen Sound -
YMCA Camp Kitchikewana Pumphouse Replacement Project
Georgian Bay Islands National Park of Canada -
Soil Remediation at Jannacks Narrows Minor Shore Light, Bala Park Island, Ontario
Jannacks Narrows Minor Shore Light, Ontario -
Tobey Dock Reconstruction
Georgian Bay Islands National Park