Serpent River First Nation - Cutler Acid Remediation Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Serpent River First Nation has proposed a remediation project for the metals, Sulphate, low pH, petroleum hydrocarbons (PHC), and polycyclic aromatic hydrocarbons (PAH) impacts at the Former Cutler Acid Site. The project involves excavation of all areas with impacted soil, excluding areas impacted only with low pH which will be remediated with hydrated lime, will be taken to a MECP licensed landfill or selected treatment facility. The Site currently contains approximately 82,200 m3 of contaminated soil requiring excavation and off-Site disposal.
Physical activities will include tree clearing and grubbing, culvert and ditch installations, excavation of impacted soil, and removal of terrestrial debris (fill, concrete house foundation, and construction and demolition materials such as concrete, bricks, wood, metal machinery parts, metal piping, reinforcing bars, and wire). After excavation is completed, the site will be backfilled and restored to a natural state in accordance with Serpent River First Nation's native grass and plant species. Any gravel roadways that were present will prior to excavation will be reinstated.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | January 28, 2026 |
| 1 | Public Comments Invited | - | December 22, 2025 |
Contacts
Indigenous Services CanadaAmenda Hong, Environment Officer
655 Bay Street
Toronto, Ontario M5G 2K4
Email: amenda.hong@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Serpent River First Nation (Ontario)
-
Nature of Activity
- Remediation and conservation
-
Assessment Status
Completed -
Start Date
2025-12-22 -
Proponent
Serpent River First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90113
Nearby assessments
...within 200 kilometres-
New Fibre Installation
Project site 13: SERPENT RIVER INDIAN RESERVE NO. 7 -
New Fibre Installation
Project site 09: SERPENT RIVER INDIAN RESERVE NO. 7 -
Sagamok First Nation- Tree Clearing and School Construction Project
Sagamok New School -
Sagamok Anishnawbek - Family Hub Complex Construction
Sagamok Anishnawbek -
New Fibre Installation
Project site 03: MISSISSAGI RIVER INDIAN RESERVE NO. 8 -
Improvements to Two Roads in Sheshagwaning First Nation
Improvements to Two Roads in Sheshagwaning First Nation -
Zhiibaahaasing Water Storage and Distribution System Upgrades
Zhiibaahaasing Indian Reserve. No. 19 -
Sheshegwaning Samson Edowishkosh Elementary School Construction
Sheshegwaning First Nation -
New Fibre Installation
Project site 16: Sheshegwaning Indian Reserve No.20 -
Mississauga First nation - Gas Bar Tank Removal
Mississauga First Nation -
New Fibre Installation
Project site 15: Zubaahaasing Indian Reserve No. 19A -
Zhiibaahaasing - 10 Unit Housing Project
Zhiibaahaasing -
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
New Fibre Installation
Project site 18: Sucker Creek Indian Reserve No.23 -
Waste Transfer Station Construction
M'Chigeeng -
New Fibre Installation
Project site 20: M'chigeeng Indian Reserve No. 22 -
WRFN Septic Bed Assessment/Replacement Program
WRFN Septic Bed Assessment/Replacement Program -
New Fibre Installation
Project site 04: WHITEFISH RIVER INDIAN RESERVE NO. 4 -
New Fibre Installation
Project site 17: Sheguandah Indian Reserve No.24 -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
15 Lot Subdivision Expansion- Whitefish River First Nation
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Whitefish River First Nation - Waste Transfer Station Construction and Landfill Closure
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
New Fibre Installation
Project site 10: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 12: WHITEFISH LAKE INDIAN RESERVE NO. 6 -
New Fibre Installation
Project site 08: THESSALON INDIAN RESERVE NO. 12 -
New Fibre Installation
Project site 05: WIKWEMIKONG UNCEDED RESERVE -
Wikwemikong First Nation - Lot Servicing
Wikwemikong Unceded Territory -
Wikwemikong First Nation - Elders Home Redevelopment
Wikwemikong First Nation -
Thessalon First Nation - Lot Servicing Project
Thessalon First Nation -
New Fibre Installation
Project site 11: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 06: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 02: THESSALON INDIAN RESERVE NO. 12 -
Victoria Mine Project
Southwest of Sudbury -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng Anishnawbek First Nation Business Park
Atikameksheng Anishnawbek First Nation -
Atikameksheng By-Pass Road Construction - additional Federal Authority
Naughton -
New Fibre Installation
Project site 14: St. Josephs Island Bird Sanctuary -
New Fibre Installation
Project site 07: GARDEN RIVER INDIAN RESERVE NO. 14 -
Fort Road Beaver Dam 2024, Fort St. Joseph National Historic Site
Fort St. Joseph National Historic Site -
New Fibre Installation
Project site 01: GARDEN RIVER INDIAN RESERVE NO. 14 -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
New Fibre Installation
Project site 19: Sagamok Indian Reserve -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
Tobermory (Little Tub) Harbour - North and West Wall Rehabilitation
Tobermory -
Kimball Cottage Decommission
Bruce Peninsula National Park of Canada -
Davis Cabin Relocation
Bruce Peninsula National Park of Canada -
Cyprus/Cameron Pedestrian Bridge Replacement
Bruce Peninsula National Park of Canada -
Ininizhimo Transitional Housing Project
Garden River First Nation -
Replacement of Drinking Water Pipes in the Block subdivision in the Village at Garden River First Nation
Garden River -
Gima Kwe Nong Parking Area
Bruce Peninsula National Park of Canada -
Gima Kwe Nong Dock Replacement
Bruce Peninsula National Park -
New Fibre Installation
Project site 1: Ella Lake -
Shaw Farm Decommission
Bruce Peninsula National Park of Canada -
Hidden Valley Road Box Culvert
Bruce Peninsula National Park -
Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
Wahnapitae First Nation -
Wahnapitae FN Micro Subdivision Project
Wahnapitae First Nation -
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
Wahnapitae First Nation Aggregate Project
location -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Dyer's Bay Small Craft Harbour - Wharf Repair
Dyer's Bay -
New Fibre Installation
Project site 2: Upper Island Lake -
Urgent Sanitary Pipe Repair and Contaminated Soil Abatement
22 Bay St., Sault Ste. Marie, ON P6A 5S2 -
Removal of Timber Fender Floats
Sault Ste. Marie Canal National Historic Site -
Sault Ste. Marie Canal Unwatering Investigation
Sault Ste. Marie Canal National Historic Site of Canada -
Installation of Downstream Stop-Log Gains, Sault Ste. Marie Canal National Historic Site
Sault Ste. Marie Canal National Historic Site -
Installation of Downstream Stop-Log Gains Sault Ste. Marie Canal National Historic Site
Sault Ste. Marie Canal National Historic Site of Canada -
Attikamek Trail Bridges - Decking and Railing Replacement
Sault Ste. Marie Canal National Historic Site of Canada -
Construction of Gazebo - Sault Ste. Marie Canal National Historic Site
Sault Ste. Marie Canal National Historic Site -
Great Lakes Power Ice Boom Timber Replacement
Sault Ste. Marie Canal National Historic Site -
Dredging at the Algoma Steel Sawmill Bay Dock, St. Mary's River, Sault Ste. Marie
Algoma Steel's Sawmill Bay Dock, St. Mary's River - federal harbour of Sault Ste. Marie -
Wahnapitae First Nation
Wahnapitae First Nation -
Côté Gold Mine Project
Gogama -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Lion's Head Harbour Dredging Project - Spring 2021
Lion's Head Harbour -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Launch Ramp Replacement, Gros Cap, Ontario
Gros Cap, Ontario -
Gros Cap Wharf Rehabilitation 2021
Gros Cap -
Batchewana - New Water Treatment Plant Construction in Goulais Mission
Goulais Mission -
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
Chippewas of Nawash Lot Servicing
Chippewas of Nawash First Nation -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Chippewas of Nawash Multi-use Building
Chippewas of Nawash First Nation -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Batchawana Small Craft Harbour Dredging and Shore Protection
Batchawana -
Chippewas of Nawash Community Centre Renovations and Additions
Neyaashiinigmiing Reserve No. 27 -
New Fibre Installation
Project site 3: Obadjiwan Indian Reserve 15E (Batchewana First Nation) -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Shawanaga First Nation - Lot Servicing for future houses
Shawanaga First Nation -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Dokis First Nation Water Treatment Plant
Dokis First Nation -
Dokis First Nation - Chaudière Bridge Replacement Project
Dokis First Nation -
Portage Channel Bridge Replacement - Keso Bay Road
Dokis -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
Portage Dam Concrete Storage Pad
Portage Dam -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Wiarton Breakwater Replacement
Wiarton Launch Ramp -
Construction of Micro-Subdivision Lots - Chapleau Cree First Nation
Chapleau Cree First Nation -
Borden Gold Mine Project
Approximately 160 kilometres southwest of Timmins -
Chapleau Cree First Nation Residential Lot Development on Margaret Ann Road
Chapleau Cree First Nation -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling